Antminer D9
- Brand Bitmain
- Hashrate 1770-1860 Gh
- Algorithm X11
- Efficiency 1.604 j/Gh
- Release date February 2023
- Cooling Air
Calculation for 1860Gh
≈ 469.93 ₽
- Power 2983.44 W
- Ads count 7
- The best price 1860 USDT
Zig D1
- Brand Dayun
- Hashrate 48Gh
- Algorithm X11
- Efficiency 45.8 j/Gh
- Release date November 2018
- Cooling Air
Calculation for 48Gh
≈ 12.13 ₽
- Power 2198.4 W
Conclusion
Let's compare how relevant Antminer D9 is compared to Zig D1 in current conditions. The unified algorithm (X11) allows switching between coins (Dash) on both ASICs, but maximum profit is currently achieved when mining Dash. Choose the right Antminer D9 version for your needs from 2 options with power ranging from 1770Gh to 1860Gh inclusive. Model Dayun Zig D1 is presented exclusively in a configuration with 48Gh, other power options are not provided for this series. The difference in 1812 Gh shows the advantage of one model, but it's also worth paying attention to the efficiency of the models. Model Antminer D9 has an efficiency of 1.604 j/Gh and Zig D1 has 45.8 j/Gh. The power consumption of Bitmain Antminer D9 1860Gh is 2983.44 Watts. Dayun Zig D1 48Gh, in turn, consumes 2198.4 Watts. The cooling type for both models is identical — classic fan airflow. 7 active listings available for Bitmain Antminer D9. The best price-to-performance ratio: 1770Gh for 32000 RUB. Offers for Dayun Zig D1 are temporarily unavailable, but our catalog contains many other profitable models.
Offers
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
CapMiner company has a low trust level- Condition New
- Availability In stock
Trust Factor
Global Mining company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 7