WhatsMiner M73
- Brand MicroBT
- Hashrate 470-526 Th
- Algorithm SHA-256
- Efficiency 14.5 j/Th
- Release date December 2025
- Cooling Hydro
Calculation for 514Th
≈ 1,663.60 ₽
- Power 7453 W
- Ads count 22
- The best price 6571 USDT
WhatsMiner M7D
- Brand MicroBT
- Hashrate 594-652 Th
- Algorithm SHA-256
- Efficiency 14.5 j/Th
- Release date March 2026
- Cooling Hydro
Calculation for 652Th
≈ 2,110.24 ₽
- Power 9454 W
Conclusion
We are comparing two devices from MicroBT — models WhatsMiner M73 (December 2025) and WhatsMiner M7D (March 2026). Both devices operate on SHA-256, mining Bitcoin, Fractal Bitcoin, Bitcoin Cash, BitcoinSV, Terracoin, Namecoin. The main profit focus is currently on Bitcoin, Fractal Bitcoin. The MicroBT WhatsMiner M73 lineup includes 29 modifications: starting performance is 470Th, while top solutions reach 526Th. The MicroBT WhatsMiner M7D lineup includes 4 modifications: starting performance is 594Th, while top solutions reach 652Th. The difference in computing power is 19.33%, but the final advantage can only be shown by the energy efficiency of the equipment. Model WhatsMiner M73 has 14.5 j/Th, while WhatsMiner M7D has 14.5 j/Th. Model WhatsMiner M73 526Th has a power consumption of 7627 Watts, while WhatsMiner M7D 652Th consumes 9454 Watts. To operate these Hydro edition models, you need an external cooling system (cooling tower). In return, you get the ability to place equipment in rooms without powerful ventilation. Compare 22 offers for MicroBT WhatsMiner M73 from verified suppliers. Right now, the 470Th configuration can be purchased at the minimum price of 345000 RUB. Currently, there are no MicroBT WhatsMiner M7D offers on the platform. If you are interested in this model, you can contact us or one of the verified companies listed on our platform.
Offers
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
TCS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
TCS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30