Antminer S21 XP
- Brand Bitmain
- Hashrate 270Th
- Algorithm SHA-256
- Efficiency 13.5 j/Th
- Release date October 2024
- Cooling Air
Calculation for 270Th
≈ 763.00 ₽
- Power 3645 W
- Ads count 27
- The best price 220000 RUB
E-DG1M
- Brand Goldshell
- Hashrate 3.4Gh
- Algorithm Scrypt
- Efficiency 529.4 j/Gh
- Release date August 2024
- Cooling Air
Calculation for 3.4Gh
≈ 119.91 ₽
- Power 1799.96 W
Conclusion
The choice between Bitmain Antminer S21 XP and Goldshell E-DG1M is a classic dilemma for mining investors. Antminer S21 XP and E-DG1M cannot be directly compared by hashrate as they operate on different protocols: SHA-256 and Scrypt respectively. Model Bitmain Antminer S21 XP is presented exclusively in a configuration with 270Th, other power options are not provided for this series. Model E-DG1M from manufacturer Goldshell is a unique solution with 3.4Gh power, available in a single version. The power consumption of Bitmain Antminer S21 XP 270Th is 3645 Watts. Goldshell E-DG1M 3.4Gh, in turn, consumes 1799.96 Watts. The cooling type for both models is identical — classic fan airflow. 27 ads found for Bitmain Antminer S21 XP. The current cost for 270Th power is from 220000 RUB. Both new and used devices are available. Currently, there are no Goldshell E-DG1M offers on the platform. If you are interested in this model, you can contact us or one of the verified companies listed on our platform.
Offers
Trust Factor
Crypto One company has a high trust level- Condition New
- Availability In stock
Trust Factor
CapMiner company has a medium trust level- Condition New
- Availability In stock
Trust Factor
Mining Depot company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Global Mining company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 7
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 15
Trust Factor
TCS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability In stock
Trust Factor
CapMiner company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 0
Trust Factor
Динтег (Векус майнинг) company has a medium trust level- Condition New
- Availability In stock
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability In stock
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 0
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 8