Antminer S19 Pro+ Hyd
- Brand Bitmain
- Hashrate 184-198 Th
- Algorithm SHA-256
- Efficiency 27.5 j/Th
- Release date May 2022
- Cooling Hydro
Calculation for 198Th
≈ 648.62 ₽
- Power 5445 W
- Ads count 4
- The best price 41300 RUB
WhatsMiner M60S
- Brand MicroBT
- Hashrate 170-192 Th
- Algorithm SHA-256
- Efficiency 18.5 j/Th
- Release date February 2024
- Cooling Air
Calculation for 192Th
≈ 628.96 ₽
- Power 3552 W
- Ads count 19
- The best price 1590 USDT
Conclusion
Today in the battle we have Antminer S19 Pro+ Hyd from Bitmain against competitor MicroBT's WhatsMiner M60S. Both devices operate on SHA-256, mining Bitcoin, Fractal Bitcoin, BitcoinSV, Bitcoin Cash, Terracoin, Namecoin. The main profit focus is currently on Bitcoin, Fractal Bitcoin. Choose the right Antminer S19 Pro+ Hyd version for your needs from 3 options with power ranging from 184Th to 198Th inclusive. The MicroBT WhatsMiner M60S lineup includes 12 modifications: starting performance is 170Th, while top solutions reach 192Th. The difference in computing power is 3.03%, but the final advantage can only be shown by the energy efficiency of the equipment. Model Antminer S19 Pro+ Hyd has 27.5 j/Th, while WhatsMiner M60S has 18.5 j/Th. Model Antminer S19 Pro+ Hyd 198Th has a power consumption of 5445 Watts, while WhatsMiner M60S 192Th consumes 3552 Watts. There is a fundamental difference in cooling type: Antminer S19 Pro+ Hyd uses Hydro, while WhatsMiner M60S operates on Air. 4 active listings available for Bitmain Antminer S19 Pro+ Hyd. The best price-to-performance ratio: 198Th for 41300 RUB. Compare 19 offers for MicroBT WhatsMiner M60S from verified suppliers. Right now, the 180Th configuration can be purchased at the minimum price of 80000 RUB.
Offers
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 0
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 15
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Global Mining company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 7
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 4
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 0
Trust Factor
Global Mining company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 7
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 0
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
TCS mining company has a high trust level- Condition Used
- Availability In stock
- Warranty (months) 0