WhatsMiner M72
- Brand MicroBT
- Hashrate 246-282 Th
- Algorithm SHA-256
- Efficiency 14.5 j/Th
- Release date December 2025
- Cooling Air
Calculation for 282Th
≈ 919.43 ₽
- Power 4089 W
- Ads count 9
- The best price 580684 RUB
WhatsMiner M73S
- Brand MicroBT
- Hashrate 500-552 Th
- Algorithm SHA-256
- Efficiency 13.5 j/Th
- Release date December 2025
- Cooling Hydro
Calculation for 550Th
≈ 1,793.23 ₽
- Power 7425 W
- Ads count 7
- The best price 558000 RUB
Conclusion
In the MicroBT lineup, models WhatsMiner M72 and WhatsMiner M73S occupy different niches despite their similar origin. Both devices operate on SHA-256, mining Bitcoin, Fractal Bitcoin, Bitcoin Cash, BitcoinSV, Terracoin, Namecoin. The main profit focus is currently on Bitcoin, Fractal Bitcoin. The WhatsMiner M72 device from MicroBT is available in a wide range of powers. Versions from 246Th to 282Th are available. The WhatsMiner M73S device from MicroBT is available in a wide range of powers. Versions from 500Th to 552Th are available. The difference in computing power is 48.91%, but the final advantage can only be shown by the energy efficiency of the equipment. Model WhatsMiner M72 has 14.5 j/Th, while WhatsMiner M73S has 13.5 j/Th. Model WhatsMiner M72 282Th has a power consumption of 4089 Watts, while WhatsMiner M73S 552Th consumes 7452 Watts. There is a fundamental difference in cooling type: WhatsMiner M72 uses Air, while WhatsMiner M73S operates on Hydro. 9 ads found for MicroBT WhatsMiner M72. The current cost for 246Th power is from 223900 RUB. Both new and used devices are available. 7 ads found for MicroBT WhatsMiner M73S. The current cost for 550Th power is from 558000 RUB. Both new and used devices are available.
Offers
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30